As usual lets begin by trying a random permutation. The result as show in the image below was 138.21 units.
Now let's try a different algorithm: List Scheduling by Shortest Processing Time
| Name | Job | Processing Time | Ready Time | Machine |
Task 1: | Brown | 3.6 | .875 | 1 |
Task 2: | Brown | 2.4 | .875 | 2 |
Task 3: | Brown | 4.25 | .875 | 3 |
Task 4: | Greeen | 2 | 4.83 | 1 |
Task 5: | Green | 4.08 | 4.83 | 2 |
Task 6: | Green | 4.21 | 4.83 | 3 |
Task 7: | Beige | 1.6 | 4.38 | 1 |
Task 8: | Beige | 2.6 | 4.38 | 2 |
Task 9: | Beige | 4.0 | 4.38 | 3 |
|