The scenario below depicts a Flow Shop with 3 machines and 3 Jobs. Each Job has 3 sub-tasks to be accomplished in each of the machines respectively. The jobs have ready times randomly assigned by the wizard.
Our objective here is to minimize the SUM OF COMPLETION TIMES.
| Name | Job | Processing Time | Ready Time | Machine |
Task 1: | Brown | 3.6 | .875 | 1 |
Task 2: | Brown | 2.4 | .875 | 2 |
Task 3: | Brown | 4.25 | .875 | 3 |
Task 4: | Greeen | 2 | 4.83 | 1 |
Task 5: | Green | 4.08 | 4.83 | 2 |
Task 6: | Green | 4.21 | 4.83 | 3 |
Task 7: | Beige | 1.6 | 4.38 | 1 |
Task 8: | Beige | 2.6 | 4.38 | 2 |
Task 9: | Beige | 4.0 | 4.38 | 3 |
|