Single Machine Multiple Machine Job Shop Flow Shop EXIT 2/6
SCHEDULER DEMO


A Single Machine Environment can be created by selecting the appropriate radio button in the wizard dialog. The scenario on the bottom simulates an Single Machine with four tasks of variable lengths, ready times and due dates.

Name length readytime due date
Job 1 (purple) 6.2 0 13
Job 2 (pink) 2.76 1 12
Job 3 (blue) 5.2 12 18
Job 4 (beige) 4.88 10 18

Please click on the image to continue. You can always click on EXIT to quit the demo.